GIRT7016 Iss 2
Interface between Station Platforms, Track and Trains
Synopsis

- Issued:
- 01/12/2007
- Published:
- 01/12/2007
- In Force:
- 02/02/2008
- Withdrawn:
- 06/02/2010
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GIRT7016 Iss 1, GIRT7014 Iss 1 |
Superseded By | GIRT7016 Iss 3 |
Lead Committee | Infrastructure - INS |
Supporting Committee | Rolling Stock - RST; Traffic Operation and Management - TOM |
Briefing Notes | 08 BN02; 09 BN31 |
Amendments
![]() Registered |
7016 Iss 2 AM001 |
Deviations
![]() Registered |
08-203-TNC
Erection of hoardings during construction at various Stations (Tracker 5512)
08-205-DGN
Sub-standard clearances located on Platform 3 over the length of the proposed Farringdon Station (Tracker 5624)
08-206-DGN
Abercynon Station Down Platform (Tracker 5702)
08-207-DGN
New modern steel-framed structure containing Platforms 9 to 11 at King's Cross Station (Tracker 5730)
08-208-TNC
Hoardings erected on Platform 2/3 and 4 at West Hampstead Thameslink Station. (Tracker 5762)
01-379-DGN
Location of structures at terminal stations
08-040-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5143)
08-041-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5145)
08-052-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5306)
08-090-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5356)
08-109-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5388)
08-137-DGN
Interface between Station Platforms, Track and Trains (Tracker 5521)
08-168-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5627)
08-169-DGN
Interface between Station Platforms, Track and Trains (Tracker No 5628)
08-201-TNC
Erection of hoardings during the construction at Twyford Station (Tracker 5510)
08-246-DGN
Penryn Station Platform Extension – Platform on curve less than 1,000m radius and gradient less than 1:500 (Tracker 5966)
09-187-TNC
Usable platform widths of Platforms 2/3 and 4 local to the hoarding during the construction of the footbridge at West Hampstead Thameslink Station.
09-188-DGN
Deptford Station new canopies and supporting columns
09-136-DGN
Platform 6 - Platform Width, The Stratford Station Upgrade
09-135-TNC
Platform 3 - 5 Platform Widths, The Stratford Station Upgrade |