Menu

GKRT0025 Iss 1

Signalling Control and Display Systems

Synopsis

This document is to define the requirements for Control and Display systems to enable the Signaller to safely control the signalling system and protect the railway.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/09/1997
Published:
30/09/1997
In Force:
04/02/1998
Withdrawn:
06/12/2003

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes SSP025 Iss 1
Superseded By GKRT0025 Iss 2
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM
Deviations
register-icon
Registered
05-107-DGN

Signalling Control Centres

06-062-DGN

Signalling Control Centres

08-132-DGN

Signalling Control Centres, alarms and indications (Tracker No 5203)

08-184-DGN

Signalling Control Centres (Tracker No 5603)

09-006-TNC

The “emergency” panel in the control centre. (Tracker 5986)

09-060-TNC

New connection (2300 points) with London Underground District Line

09-078-TNC

Liverpool Street IECC – non depiction of Barking Link