GKRT0025 Iss 2
Signalling Control Centres
Synopsis

- Issued:
- 01/10/2003
- Published:
- 04/10/2003
- In Force:
- 06/12/2003
- Withdrawn:
- 05/03/2011
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0025 Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Briefing Notes | 03 BN27; 10 BN29 |
Impact Assessments
![]() Registered |
03 IA13; 10 IA16 |
Deviations
![]() Registered |
07-011-NC
Signalling Control Centres
08-087-NC
Signalling Control Centres (Tracker No 5418)
09-205-DGN
New NX style control and indication panel at South Tottenham Station Junction S.B.
09-282-TNC
Indication of recovered infrastructure on Liverpool Street IECC (Thornton Fields area)
08-221-TNC
Temporary satellite panel at Edge Hill for the re-instatement of the Olive Mount Chord (Tracker 5777)
08-220-TNC
Incorrect identities in fringe area of Sandhills IECC (Tracker 5776)
08-171-TNC
Signalling Control Centres: Liverpool Street IECC: Non-indication of new cross-over at Barking (Tracker No 5657)
08-170-TNC
Signalling Control Centres (Tracker No 5656)
07-117-TNC
Signalling Control Centres (Tracker No 4839)
06-171-TNC
Signalling Control Centres
06-123-TNC
Signalling Control Centres
06-122-TNC
Signalling Control Centres
05-206-TNC
Signalling Control Centres
05-122-TNC
Provision of control centre equipment
04-271-TNC
Provision of control centre equipment
05-127-TNC
Signalling Control Centres |