Menu

GLRT1210 Iss 2

AC Energy Subsystem and Interfaces to Rolling Stock Subsystem

Synopsis

This document defines requirements for the alternating current (AC) energy subsystem and the interfaces to rolling stock operating over the AC electrified railway.

Summary Of Changes

Revisions to sections 3.4 and 3.5 relating to pantograph/overhead contact line (OCL) mechanical interaction to align with TSI requirements and compatibility with non-TSI OCL. Amendments and Clarifications from issue one have also been addressed.

12 mnth review - Deferred for the time being.

Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
07/12/2019
Published:
07/12/2019
In Force:
07/12/2019
Withdrawn:
04/03/2023
Next Review:
07/03/2021

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GLRT1210 Iss 1
Superseded By GLRT1210 Iss 3, RIS-1853-ENE Iss 1
Lead Committee Energy - ENE
Supporting Committee Rolling Stock - RST; Plant - PLT
Briefing Notes 19 BN19
Impact Assessments
register-icon
Registered
19 IA12
Deviations
register-icon
Registered
22-099-DEV

Midland Main Line Electrification - Footbridge SPC3-4AA Parapet deviation at Cooks Lane Footbridge, LE18 3TA

22-097-DEV

Midland Main Line Electrification - Footbridge SPC3-2A parapet deviation at Wigston footbridge, LE18 2RD

22-075-DEV

Bridge parapet wall height for overbridge OB011/093 at Kilknowe Farm Accommodation, TD1 1QT

22-072-DEV

Bridge Parapet Wall Height – OB011/079 – Harpers

22-059-DEV

Crossrail Anglia Electrification Project / for "Dimension X" of the OCLZ

22-065-DEV

Bridge Parapet Wall Height - OB27F - Market Harborough (A6)

22-064-DEV

Bridge Parapet Wall Height - FB27EA - Langton Road

22-063-DEV

Bridge Parapet Wall Height - FB16B - Kibworth Harcourt

22-062-DEV

Bridge Parapet Wall Height - OB16 - Warwick Road

22-060-DEV

Bridge Parapet Wall Height - OB09C - Wistow Footbridge

22-066-DEV

Bridge Parapet Wall Height – OB223/020A – Redwood Drive

22-016-DEV

Transpennine route upgrade - Stalybridge Station (Overhead Contact Line Zone (OCLZ)).

22-022-DEV

Transpennine Route Upgrade - OCLZ

22-031-DEV

Midland Mainline route electrification - OCLZ: SPC3 Wellingborough-Wigston South Junction (open route)

22-033-DEV

Bridge Parapet Wall Height - OB090/009-1 - Carricknowe Tram

22-034-DEV

Bridge Parapet Wall Height – OB090/009a – Carricknowe FB

22-035-DEV

Bridge Parapet Wall Height - OB223/022A - New M77 Approach

22-036-DEV

Bridge Parapet Wall Height – OB223/023A1 – M77

22-037-DEV

Bridge Parapet Wall Height – OB223/015A1 – Strathfillan Road (OP)

22-038-DEV

Bridge Parapet Wall Height - OB223/018 - Overbridge

View All