GLRT1210 Iss 3
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
Synopsis
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac electrified railway.
Summary Of Changes
Revision of all sections including removal of several requirements that do not meet the criteria for national technical rules. Some requirements transferred to new Rail Industry Standard RIS-1853-ENE issue one.
Optional reading and resources:
Where do we use standards? Energy
Read full standard

Registered
Live
Railway Group Standard
- Issued:
- 03/12/2022
- Published:
- 03/12/2022
- In Force:
- 04/03/2023
- Next Review:
- 04/03/2024
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GLRT1210 Iss 2, GLGN1610 Iss 2 |
Lead Committee | Energy - ENE |
Supporting Committee | Rolling Stock - RST; Infrastructure - INS; Plant - PLT |
Briefing Notes | 22 BN24 |
Impact Assessments
![]() Registered |
22 IA20 |
Deviations
![]() Registered |
23-025-DEV
Radio Frequency Identification (RFID) beacons activation at phase (neutral) sections in place of automatic power control (APC) magnets on the Core Valley Lines (CVL), Wales |