GMRT2130 Iss 4
Vehicle Fire, Safety and Evacuation
Synopsis
Summary Of Changes

- Issued:
- 07/12/2013
- Published:
- 07/12/2013
- In Force:
- 01/03/2014
- Withdrawn:
- 06/06/2020
Details
Consultation Status | Closed |
Vehicle Assessment | Yes |
Supersedes | GMRT2130 Iss 3 |
Superseded By | RIS-2730-RST Iss 1, GMRT2130 Iss 5 |
Lead Committee | Rolling Stock - RST |
Supporting Committee | Plant - PLT; Traffic Operation and Management - TOM |
Briefing Notes | 13 BN29 |
Impact Assessments
![]() Registered |
13 IA17 |
Amendments
![]() Registered |
2130 Iss 4 AM001 |
Supporting Documents | GMGN2630 Iss 1 ; GMRC2530 Iss 1 ; GMRC2531 Iss 1 ; GMRC2532 Iss 1 ; GMRC2533 Iss 1 ; GMRC2534 Iss 1 |
Deviations
![]() Registered |
14-002-DEV
Deviation against the requirements of GMRT2130 Issue 4.
14-015-DEV
Advanced stage deviation to GMRT2130 Issue 4 for Class 68 UK Light locomotive.
13-214-DEV
Derogation to GMRT2130 Issue 03 for the MPVs and Wagons of the Network Rail High Output OLE Construction System (HOPS).
14-059-DEV
Deviation against GMRT2130 Issue 4 for GSM-R Equipment Installation.
14-051-DEV
Advance stage deviation for installation of GSM-R to Plasser & Theurer 09-16 CSM Tampers.
14-109-DEV
Advance stage deviation for installation of Global System for Mobile communications for Railways (GSM-R) to Class 37 Locomotives.
14-166-DEV
Advance stage deviation for installation of Global System for Mobile communications for Railways (GSM-R) to a Class 47 Locomotive.
15-039-DEV
Sheffield Tram-Train Fire Safety and Evacuation Performance.
15-066-DEV
Class 387 – Compliance to GM/RT2130 Issue 4.
15-039-DEV Revised 15 12 2015
Sheffield Tram-Train Fire Safety and Evacuation Performance.
18-019-DEV
Class 399 Fire Performance and Emergency Lighting.
22-093-DEV
A comparative case for fire assessment of the interior configuration rather than full installation fire testing and a time-limited deviation for the condensate drains penetrating the floor barrier. |