Menu

GORT3437 Iss 8

Defective On-Train Equipment

Synopsis

This document mandates the requirements relating to the production of contingency plans, which have to be applied when on-train equipment becomes defective. It applies to all trains being brought into service, and to those in service, on Network Rail managed infrastructure

Summary Of Changes

GORT3437 was reviewed in accordance with the final report of the European Commission's Task Force on National Safety Rules (NSRs). The review concluded it duplicated European legislation, and could not be retained as a NSR nor as a RGS. Its requirements remain valid and have been incorporated in RIS-3437-TOM Iss 1.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
05/09/2015
Published:
05/09/2015
In Force:
05/12/2015
Withdrawn:
04/03/2017

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GORT3437 Iss 7
Superseded By RIS-3437-TOM Iss 1
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS
Briefing Notes 15 BN12; 16 BN41
Impact Assessments
register-icon
Registered
15 IA11; 16 IA39
Amendments
register-icon
Registered
3437 Iss 8 AM001; 3437 Iss 8 AM002