"> ">
Menu

Poster I2 Iss 1

Securing of Loads

Synopsis

This poster is provided by the M&EE Networking Group to remind the industry to ensure that the most appropriate method of securing/retention is planned and implemented based on the type and condition of the load.

Summary Of Changes

New Poster
Withdrawn
M and EE Networking Group: Poster
Issued:
01/07/2016
Published:
03/09/2016
In Force:
03/09/2016
Withdrawn:
05/09/2020

Details

Vehicle Assessment No
Superseded By Poster I2 Iss 2