Poster I2 Iss 1
Securing of Loads
Synopsis
This poster is provided by the M&EE Networking Group to remind the industry to ensure that the most appropriate method of securing/retention is planned and implemented based on the type and condition of the load.
Summary Of Changes
New Poster
Withdrawn
M and EE Networking Group:
Poster
- Issued:
- 01/07/2016
- Published:
- 03/09/2016
- In Force:
- 03/09/2016
- Withdrawn:
- 05/09/2020
Details
Vehicle Assessment | No |
Superseded By | Poster I2 Iss 2 |