Poster I2 Iss 2
Securing of Loads
Synopsis
This poster is provided by the M&EE Networking Group to remind the industry to ensure that the most appropriate method
of securing/retention is planned and implemented based on the type and condition of the load..
Summary Of Changes
Revised and republished
Live
M and EE Networking Group:
Poster
- Issued:
- 15/07/2020
- Published:
- 05/09/2020
Details
Vehicle Assessment | No |
Supersedes | Poster I2 Iss 1 |