RIS-1530-PLT Iss 4
Rail Industry Standard for Engineering Acceptance of On-Track Plant and Associated Equipment
Synopsis
RIS-1530-PLT is a single document on engineering acceptance of on-track plant (OTP) and associated equipment. The document contains both requirements and guidance for the rail industry to use if they so choose. The requirements only become mandatory when invoked by contract or a commitment in the duty holder's Railway Safety Case.
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 01/12/2012
- Published:
- 01/12/2012
- In Force:
- 01/12/2012
- Withdrawn:
- 07/06/2014
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | RIS-1530-PLT Iss 3 |
Superseded By | RIS-1530-PLT Iss 5 |
Lead Committee | Plant - PLT |
Briefing Notes | 12 BN19; 14 BN10 |
Impact Assessments
![]() Registered |
14 IA10 |