RIS-3437-TOM Iss 2
Defective On-Train Equipment
Synopsis
This document contains requirements relating to the production of contingency plans, which items of on-train equipment they are to include and the type of arrangements to be applied when they become defective.
Summary Of Changes
Merges RIS-3437-TOM issue one with GOGN3637 issue two in line with the Strategy for Standards. A number of requirements, including those relating to AWS, TPWS and DSD, were amended following a series of industry risk workshops. This document is currently under review.
12 mnth review - The content of this document will be reviewed under an existing or future project.
Optional reading and resources:
Case study: defective on-train equipment
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 01/09/2018
- Published:
- 01/09/2018
- In Force:
- 01/09/2018
- Withdrawn:
- 03/09/2022
- Last Review:
- 01/09/2019
- Next Review:
- 01/09/2024
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | RIS-3437-TOM Iss 1, GOGN3637 Iss 2 |
Superseded By | RIS-3437-TOM Iss 3 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Rolling Stock - RST; Plant - PLT |
Briefing Notes | 18 BN17 |
Impact Assessments
![]() Registered |
18 IA19 |
Amendments
![]() Registered |
3437-RIS Iss 2 AM001 |