Menu

RIS-3440-TOM Iss 1

Steam Locomotive Operation

Synopsis

This document sets out risk control measures to manage the operation of steam locomotives on GB mainline infrastructure.

Summary Of Changes

RIS-3440-TOM reproduces GORT3440 in its entirety, unchanged in Annex A. This RIS can be adopted by IMs and RUs to help discharge legal responsibilities placed on them by the Railways and Other Guided Transport Systems (Safety) Regulations, 2006, to have procedures and methods for carrying out risk evaluations and implementing risk control measures in their Safety Management Systems.
Read full standard
register-icon
Registered
Withdrawn
Rail Industry Standard
Issued:
03/12/2016
Published:
03/12/2016
In Force:
03/12/2016
Withdrawn:
02/12/2017

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GORT3440 Iss 2
Superseded By RIS-3440-TOM Iss 2
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS; Energy - ENE; Infrastructure - INS; Rolling Stock - RST
Briefing Notes 16 BN42; 17 BN24
Impact Assessments
register-icon
Registered
16 IA40; 17 IA26
Deviations
register-icon
Registered
17-013-DEV

90 mph testing of new build A1 Steam Locomotive 60163 'Tornado' (TOPS 98863)