Menu

RIS-8034-CCS Iss 1

Maintenance of Signal and Operational Sign Visibility

Synopsis

This document sets out the requirements necessary to ensure that the visibility and alignment of signals, and operational signs that perform the function of signals, are not adversely affected during the life of the equipment.

Summary Of Changes

RIS-8034-CCS reproduces GERT8034 in its entirety, unchanged in Annex A, together with it supporting guidance, GEGN8634 in Annex B. This RIS can be adopted by IMs and RUs to help discharge their legal responsibilities to manage the hazards and mitigate the risks associated with maintenance of signal and operational sign visibility.

13/2/2020 - The content of this document will be reviewed as part of an existing or future project.

Read full standard
register-icon
Registered
Live
Rail Industry Standard
Issued:
03/12/2016
Published:
03/12/2016
In Force:
03/12/2016
Last Review:
13/02/2020
Next Review:
01/12/2022

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8034 Iss 2, GEGN8634 Iss 1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Energy - ENE; Infrastructure - INS; Traffic Operation and Management - TOM
Briefing Notes 16 BN27
Impact Assessments
register-icon
Registered
16 IA25