RIS-8034-CCS Iss 1
Maintenance of Signal and Operational Sign Visibility
Synopsis
This document sets out the requirements necessary to ensure that the visibility and alignment of signals, and operational signs that perform the function of signals, are not adversely affected during the life of the equipment.
Summary Of Changes
RIS-8034-CCS reproduces GERT8034 in its entirety, unchanged in Annex A, together with it supporting guidance, GEGN8634 in Annex B. This RIS can be adopted by IMs and RUs to help discharge their legal responsibilities to manage the hazards and mitigate the risks associated with maintenance of signal and operational sign visibility.
13/2/2020 - The content of this document will be reviewed as part of an existing or future project.
Optional reading and resources:
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 03/12/2016
- Published:
- 03/12/2016
- In Force:
- 03/12/2016
- Withdrawn:
- 01/03/2025
- Last Review:
- 13/02/2020
- Next Review:
- 01/12/2022
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8034 Iss 2, GEGN8634 Iss 1 |
Superseded By | RIS-7708-INS Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Energy - ENE; Infrastructure - INS; Traffic Operation and Management - TOM |
Briefing Notes | 16 BN27 |
Impact Assessments
![]() Registered |
16 IA25 |