GERT8000-HB12 ERTMS Iss 3
Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession on ERTMS lines where lineside signals are not provided
Synopsis
You will need this handbook if you carry out the duties of the ES or SWL on ERTMS lines.
Summary Of Changes
It is no longer permitted for work in connection with isolations of the AC or DC electrification systems to begin before the work-site marker boards are in position so section 3.3 has been revised to remove reference to this being allowed. The same section has also been reworded to make it clear that no other work can commence within the work site until the PICOP has told the ES that the work site has been granted.
A new section 6.9 has been added describing the actions necessary when a controller of site safety (COSS), designated person (DP) or machine controller (MC) requests line protection for work to be carried out on a rail vehicle.
Section 7.8 has been renamed ‘Manually-controlled level crossing’ to remove gender-specific language.
Optional reading and resources:
- Issued:
- 03/09/2022
- Published:
- 03/09/2022
- In Force:
- 03/12/2022
- Next Review:
- 03/12/2023
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-HB12 ERTMS Iss 2 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Rolling Stock - RST; Plant - PLT |
Impact Assessments
Registered |
22 IA16 |
Supporting Documents | GERT8000-RBBL Iss 38 ; GERT8000 Issue HB Iss 16 |
Deviations
Registered |
23-040-DEV
Possession Optimisation - enabling clearer safety communications in possessions through web-enabled devices |