GERT8000-HB12 ERTMS Iss 4
Duties of the engineering supervisor (ES) in a possession on ERTMS lines where lineside signals
Synopsis
Summary Of Changes
The title of the handbook, as well as sections 2, 8.1 and 10.2, have been changed to remove reference to the obsolete competency of safe work leader.
The requirement to sign the work site certificate RT3199 upon giving up the work site has been withdrawn. Section 10.1 ‘Normal arrangements’ and section 10.3 ‘When every COSS or IWA no longer needs protection’ have been changed as a result.
These changes form part of the suite of general updates issued annually which are intended to improve understanding and application of the content of the Rule Book and provide opportunities for duty holders to operate more efficiently.
Changes have also been made to the situations in which unassisted lookouts can be used as a safe system of work, and this handbook has been amended to reflect those changes. As a result, section 4.7 on ‘Safe system of work using lookouts (lookout warning)’ has been withdrawn as this is no longer permitted.
The changes to reduce the use of the lookout competency would be expected to contribute to a reduction in trackside risk and support the work of the Network Rail Safety Task Force.
- Issued:
- 06/09/2025
- Published:
- 06/09/2025
- In Force:
- 06/12/2025
- Next Review:
- 06/12/2025
Details
| Consultation Status | Closed |
| Vehicle Assessment | No |
| Supersedes | GERT8000-HB12 ERTMS Iss 3 |
| Associated Standard | GERT8000-RBBL Iss 42 |
| Lead Committee | Traffic Operation and Management - TOM |
| Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
|
Impact Assessments
Registered |
25 IA21; 25 IA22 |