GIRT7033 Iss 4.1
Lineside Operational Signs - Product Requirements
Synopsis
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and windscreens.
Summary Of Changes
Updated legislative references following the UK’s departure from the EU, including changing from TSIs to NTSNs.
Optional reading and resources:
Read full standard

Registered
Live
Railway Group Standard
- Issued:
- 03/06/2023
- Published:
- 03/06/2023
- In Force:
- 03/06/2023
- Next Review:
- 01/06/2027
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GIRT7033 Iss 4 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Traffic Operation and Management - TOM; Energy - ENE |
Briefing Notes | 23 BN12 |
Supporting Documents | RIS-0733-CCS Iss 1 |