Menu

GKRT0044 Iss 3

Permissive Working

Synopsis

This document defines the requirements associated with signalling a second train onto a section of railway line which is already occupied by a train. The change in issue three replaces the requirements for the approaching train to be at a stand, or nearly at a stand before the calling-on movement authority is displayed. The new requirements enable operational efficiencies to be achieved by allowing the calling-on movement authority to be displayed when the approaching train is within 100 m of the signal and the speed of the train is consistent with the driver transitioning to the permissive movement.

Summary Of Changes

With effect from 03/03/2018, parts of this document have been superseded by RIS-0703-CCS Iss 1 and RIS-0713-CCS Iss 1. As the document is currently the subject of other standards' projects, it will remain an extant document until the relevant requirements are addressed in a new RIS.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
06/12/2014
Published:
06/12/2014
In Force:
07/03/2015
Withdrawn:
01/12/2018

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GKRT0044 Iss 2
Superseded By RIS-0744-CCS Iss 1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM
Briefing Notes 14 BN15; 18 BN26
Impact Assessments
register-icon
Registered
14 IA17; 18 IA01; 18 IA32
Supporting Documents GKGN0644 Iss 2
Deviations
register-icon
Registered
16-002-DEV

Doncaster Station Area Capacity Enhancements - Provision of Signalling Controls for

17-107-DEV

Redhill Platform 0: non-provision of permissive working interlocking functions (Huddersfield