GMRT2002 Iss 2
Acceptance Testing of Rail Vehicles
Synopsis
This document defines the essential elements of the acceptance testing process which should be completed before rail vehicles are allowed to operate on Railtrack controlled infrastructure. It also defines the requirements to minimise the risk when rail vehicles are subject to on-track testing as part of the process for the Engineering Acceptance of Rail Vehicles.
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/12/1995
- Published:
- 01/12/1995
- In Force:
- 06/04/1996
- Withdrawn:
- 01/12/2000
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GMRT2002 Iss 1 |
Superseded By | GMRT2000 Iss 1 |
Lead Committee | Rolling Stock - RST |
Briefing Notes | 00 BN15 |