RIS-0036-CCS Iss 1
Transitions Between Signalling Systems
Synopsis
This document sets out the requirements for managing the transition between running lines signalled with lineside signals and lines signalled using other signalling principles.
Summary Of Changes
RIS-0036-CCS Iss 1 reproduces GKRT0036 in its entirety, unchanged in Annex A, together with its supporting guidance GKGN0636 in Annex B. This RIS can be adopted by IMs and RUs to help discharge their legal responsibilities to manage the hazards and mitigate the risks associated with managing transitions between signalling systems. This document is currently under review.
12 mnth review - The content of this document will be reviewed as part of an existing or future project.
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 03/12/2016
- Published:
- 03/12/2016
- In Force:
- 03/12/2016
- Withdrawn:
- 05/06/2021
- Next Review:
- 01/12/2022
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0036 Iss 2, GKGN0636 Iss 1 |
Superseded By | RIS-0036-CCS Iss 2 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Energy - ENE; Traffic Operation and Management - TOM |
Briefing Notes | 16 BN20 |
Impact Assessments
![]() Registered |
16 IA18 |