Menu

RIS-0792-CCS Iss 1

Level Crossing Operational Interfaces with Trains

Synopsis

This document sets out control, command and signalling requirements and guidance for level crossing functionality, so that it is compatible with infrastructure manager operations at stations and railway undertaking operations.

Summary Of Changes

The requirements on positioning stop signals from GKRT0192 have been withdrawn and new guidance has been provided in RIS-0792-CCS to support the positioning of stop signals at level crossings. Additional guidance has been included to support the upgrade of AOCLs to have barriers without requiring a telephone. Content on ETC has been withdrawn as it is covered by the ERTMS reference design. Amendments to GKRT0192 have been incorporated in RIS-0792-CCS Iss 1.

12 mnth review - The content of this document will be reviewed under an existing or future project.

Read full standard
register-icon
Registered
Live
Rail Industry Standard
Issued:
03/12/2016
Published:
03/12/2016
In Force:
03/12/2016
Last Review:
18/02/2018
Next Review:
01/12/2022

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GKRT0192 Iss 2, GKGN0692 Iss 1, RIS-0792-CCS Iss 1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM
Briefing Notes 16 BN21
Impact Assessments
register-icon
Registered
16 IA19