Menu

Sign AJ14 Iss 1

Raise pantograph (temporary power changeover)

Synopsis

This document provides design details for sign AJ14 - Raise pantograph (temporary power changeover).

Summary Of Changes

To introduce sign AJ14 ‘Raise pantograph (temporary power changeover)’ to the signs catalogue.  The sign means end of temporary traction changeover area from the overhead line (OHL).

The new sign forms part of a suite of standards changes relating to the introduction of new permanent and temporary power changeover signs applicable to multi-mode trains. It is anticipated that this suite of changes will make some contribution to reducing the number of failed changeovers.

 
Read full standard
register-icon
Registered
Live
Lineside Operational Signs: Electrical Traction Signs
Issued:
01/03/2025
Published:
01/03/2025
Next Review:
01/03/2026

Details

Vehicle Assessment No
Associated Standard RIS-0733-CCS Iss 1.3, RS521 Iss 8, RIS-3784-TOM Iss 2
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM; Rolling Stock - RST
Impact Assessments
register-icon
Registered
25 IA08