From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 13
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 3
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 4
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
This document sets out the approach for the management of signal overrun risk consistent with the application of the Common Safety Method on Risk…
GIRT7006 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
GIGN7606 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
Mechanical Trainstop System Interface
This document details the track / train interface requirements for mechanical trainstop systems. GERT8018 issue two which has been up-issued following…
GERT8018 Iss 1
December 2012
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 5
Guidance on Mechanical Trainstop System
This document gives guidance on GERT8018 issue two which has been up-issued following completion of the filtering process that identifies that a…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 3
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 4
Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
This document sets out the approach for the management of signal overrun risk consistent with the application of the Common Safety Method on Risk…
GIRT7006 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
GIGN7606 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
Mechanical Trainstop System Interface
This document details the track / train interface requirements for mechanical trainstop systems. GERT8018 issue two which has been up-issued following…
GERT8018 Iss 1
December 2012
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 5
Guidance on Mechanical Trainstop System
This document gives guidance on GERT8018 issue two which has been up-issued following completion of the filtering process that identifies that a…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 13
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Issue Date
From: To:No results found
Issue Date
From: To:Code of Practice Planning for the Use of Mobile Operated Plant
This Code of Practice details minimum requirements for planning for the use of mobile operated plant excluding lifting operations. It applies to…
COP0002 Iss 12
September 2023
Withdrawn
Code of Practice for OTM Route Conducting Policy
This Code of Practice contains requirements and guidance for OTM driver’s route conducting or being conducted. Also to assist in the improvement of…
Code of Practice for Control of Mobile Communication Equipment use in Driving Cabs
This Code of Practice contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains. It sets…
COP0129 Iss 1
June 2023
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
Code of Practice Protection of Non PTS Holders at OTM Stabling Points
This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…
Code of Practice for Use and Loading of MEWPs
This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…
COP0036 Iss 1
June 2022
Withdrawn