From: To:Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Open level crossing combined speed restriction / whistleboard
This document provides design details for AH02m sign - Open level crossing combined speed restriction / whistleboard.
Automatic level crossing wrong direction speed restriction board
This document provides design details for AH04m sign - Automatic level crossing wrong direction speed restriction board.
Neutral section warning board
This document provides design details for AJ01 sign - Neutral section warning board.
Document Type
Issue Date
From: To:Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…