Menu

GCRT5101 Iss 1

Technical Approval Requirements for Changes to the Infrastructure

Synopsis

Withdrawn. The standards in the 'Infrastructure General' package contain a miscellaneous collection of requirements that are not specific to any one infrastructure discipline - they are applicable to the infrastructure (in the narrow sense of track, structures and stations), control command and signalling, and energy (electrification) sub-systems. The standards are withdrawn as requirements they contain do not meet the risk scope test set out in Annex G of the Railway Group Standards Code (issue two, 2006). Infrastructure managers will continue to manage the risk that could arise in the areas covered by these standards by the application of their Safety Management Systems and their internal standards and procedures.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/07/1996
Published:
30/07/1996
In Force:
01/02/1997
Withdrawn:
01/12/2007

Details

Consultation Status Closed
Vehicle Assessment No
Lead Committee Infrastructure - INS
Supporting Committee Control Command and Signalling - CCS; Energy - ENE
Briefing Notes 07 BN34