Standards Catalogue
Search for standards by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1), or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Crossover health and safety fatigue risks
TN3304 highlights the importance of considering fatigue risk from both an occupational health and operational aspect, to ensure that the crossover…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Work-site Certificate
This form is used by the engineering supervisor (ES) to record arrangements for setting up work sites within a possession of a running line.
Form RT3199 Iss 12-25
September 2026
Withdrawn
- Impact Assessments 1
- Deviations 2
Changes to National Operations Publications for September 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Sighting of Signals, Indicators, Signs and Lineside Markers
This document sets out requirements and gives guidance on the process used to confirm that train operators can reliably detect, read, interpret and…
RIS-0737-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document sets out the industry agreed process for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2.1
September 2026
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Possession arrangements form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Crossover health and safety fatigue risks
TN3304 highlights the importance of considering fatigue risk from both an occupational health and operational aspect, to ensure that the crossover…
Sighting of Signals, Indicators, Signs and Lineside Markers
This document sets out requirements and gives guidance on the process used to confirm that train operators can reliably detect, read, interpret and…
RIS-0737-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document sets out the industry agreed process for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2.1
September 2026
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Management of Route Knowledge
RIS-3702-TOM Management of Route Knowledge sets out requirements and guidance relating to the route knowledge of staff who carry out safety-critical…
RIS-3702-TOM Iss 3
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Key Plant Principles
During the revision of its plant standards, RSSB found some duplication. RSSB and Plant Standards Committee decided it would be helpful to industry to…
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB Standards…
Guidance Note on the Competence and Training of Freight Train Preparers
GOGN3617 assists railway undertakings in the creation of a framework for the training, competence and assessment of staff who undertake a freight…
Engineering Requirements for Dispatch of Trains from Platforms
RIS-8060-CCS sets out engineering requirements and guidance on control measures for train dispatch systems. The requirements and guidance complement…
RIS-8060-CCS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Requirements for the Operation of Freight Trains and the Conveyance of Dangerous Goods by any Train
RIS-3781-TOM sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 2
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Station Infrastructure
This document provides requirements and guidance for the design of infrastructure at stations for the Great Britain (GB) mainline.
RIS-7700-INS Iss 3
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7701-INS Iss 1
September 2026
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Work-site Certificate
This form is used by the engineering supervisor (ES) to record arrangements for setting up work sites within a possession of a running line.
Form RT3199 Iss 12-25
September 2026
Withdrawn
- Impact Assessments 1
- Deviations 2
Changes to National Operations Publications for September 2026
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Possession arrangements form
This form is used by the PICOP to record the arrangements for a possession of a running line.
IWA or COSS setting up safe systems of work within possessions
You will need this handbook if you carry out the duties of an IWA or COSS setting up safe systems of work within possessions.
GERT8000-HB9 Iss 9
September 2026
Withdrawn
- Impact Assessments 2
- Deviations 1
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
GERT8000-TW4 Iss 2
September 2026
Withdrawn
- Impact Assessments 1
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 13
September 2026
Withdrawn
- Impact Assessments 1
- Deviations 3
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
ETCS Location Marker
This document provides design details for sign AB10 - ETCS location marker.
Permissible speed acceleration indicator
This document provides design details for sign AD06 - Permissible speed acceleration indicator.
Temporary speed restriction termination - Acceleration indicator
This document provides design details for sign AF09 - Temporary speed restriction termination - Acceleration indicator.
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
Document Type
Issue Date
From: To:Consequences of Lifting Whilst in "Dig Mode" or RCI Inactive / Overridden
This poster is provided by the M&EE Networking Group to remind industry about the serious consequences of lifting whilst in “Dig Mode” or if the RCI…
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
Rated Capacity Indicator (RCI) Status Indicator Lights
This poster is provided by the M&EE Networking Group to remind industry about coloured indicator lights fitted to RRV excavator cranes and the…
OTP Professional Driving Guidance
The instructions within this guidance booklet prescribe the professionalism and driving techniques to be applied by OTP operators. They have been…