Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13.1
November 2023
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trackworkers Iss 12
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 13
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Rail Traffic Loading Requirements for the Design of Railway Structures
GCGN5612 gives guidance on the background and application of the rail traffic loading requirements for the design of railway structures set out in BS…
GCGN5612 Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Permissible Speeds
This document sets out requirements, rationale and guidance for signing of permissible speeds applicable to trains operated on the Great Britain (GB)…
RIS-0734-CCS Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…
RIS-0733-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
IWA, COSS or PC blocking a line
You will need this handbook if you carry out the duties of a IWA, COSS or PC blocking a line.
GERT8000-HB8 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 1
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller, train preparer or competent person.
GERT8000-TW1 Iss 19
September 2023
Live Pending Withdrawal
- Impact Assessments 2
- Technical Notes 1
- Deviations 2
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.
GERT8000-OTM Iss 11
September 2023
Live Pending Withdrawal
- Impact Assessments 1
Defective or isolated vehicles and on-train equipment
You will need this module if you carry out the duties of a driver, guard, signaller or train preparer. It sets out the operational instructions to be…
GERT8000-TW5 Iss 12
September 2023
Live Pending Withdrawal
- Impact Assessments 1
- Technical Notes 2
Wrong-direction movements
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-TW7 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 4
Level crossings - drivers' instructions
You will need this module if you carry out the duties of a driver.
GERT8000-TW8 Iss 9.1
November 2022
Live Pending Withdrawal
- Impact Assessments 1
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 11
September 2023
Live Pending Withdrawal
- Impact Assessments 1
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 6
September 2020
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 1
Termination of adhesion condition
This document provides design details for AK214 sign - Termination of adhesion condition
Warnings
This document provides design details for BA02 sign - Warnings.
Mind the gap / step
This document provides design details for CA02 sign - Mind the gap / step.
Supplementary sign for level crossings
This document provides design details for CC02 sign - Supplementary sign for level crossings.
Instructions for use at a vehicular crossing with a telephone (PCR diagram 103)
This document provides design details for CC05 sign - Instructions for use at a vehicular crossing with a telephone (PCR diagram 103).
Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram 105)
This document provides design details for CC07 sign - Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram…
Reminder at a crossing with user-operated gates (PCR diagram 111)
This document provides design details for CC11 sign - Reminder at a crossing with user-operated gates (PCR diagram 111)
Sign at a vehicular crossing where there are overhead electric wires and the road approaches are on a gradient (PCR diagram 113)
This document provides design details for CC13 sign - Sign at a vehicular crossing where there are overhead electric wires and the road approaches are…
Telephone number
This document provides design details for DA01 sign - Telephone number
Electrical hazard
This document provides design details for BD01 sign - Electrical hazard.
Document Type
Issue Date
From: To:Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Management of Siding Safety Surveys
This Code of Practiceprovides guidance to enable the effective setting up of a safe system of work within all sidings allocated for stabling and…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.
OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting device and the restrictions…
Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
Code of Practice for Brake Testing of OTP
This Code of Practice details the testing of the braking system of OTP excluding Trolleys during operations and routine maintenance examination…